Activities per year
Project Details
Description
Through studies of historic and contemporary columns and column constructions principals for new material and spacial possibilities will be examined in drawing and through material experiments in workshop based on :
Circular principles about resource consumption, recycling and design for
disassembly as “obstructions” in an artistic process of making.
Experiments and creation in the workshop as prerequisites for the "the unforeseen”
Neighboring materials
Circular principles about resource consumption, recycling and design for
disassembly as “obstructions” in an artistic process of making.
Experiments and creation in the workshop as prerequisites for the "the unforeseen”
Neighboring materials
Key findings
The idea is to present working models scale 1:1 of partial columns and 1:10/1:20 of column structures as a bank of preliminary investigations & experiments for further study. The architectural experiments will also address structural issues / scientific competences at the institute of technology IBT as well as partners from practice and industry.
Status | Finished |
---|---|
Effective start/end date | 01/11/2018 → 31/12/2019 |
Activities
- 1 Grants, scholarships, distinctions
-
Tildelt arbejdslegat fra Statens Kunstfond 2018
Frans Drewniak (Participant)
1 Apr 2018Activity: Other activity types › Grants, scholarships, distinctions
-
Columns Worth Stealing: værk
Drewniak, F., 14 Dec 2020Publications: Non-textual form › Work › Research › peer-review
Open AccessFile19 Downloads (Pure) -
Columns Worth Stealing: refleksion
Drewniak, F., 14 Dec 2020, p. 01-13, 13 p.Publications: Working paper › Research › peer-review
Open AccessFile27 Downloads (Pure)